Schemat Plan 53C
Schemat Plan 53C
Legend
  • 1. barrier fluid make-up
  • 2. piston accumulator
  • 3. pressure reference
  • 4. flush (F)
  • 5. barrier liquid outlet (LBO)
  • 6. barrier liquid inlet (LBI)
  • 7. mechanical seal chamber
  • 8. vent
  • 9. barrier fluid drain
  • LI. level indicator
  • LT. level transmitter
  • PRV. pressure relief valve
  • PDIT. differential pressure transmitter with local indicator
  • TI. temperature indicator
  • a. If specified.
  • b. ...a vertical finned air cooler shall be installed

Application of external piping feeding liquid to the barrier system in order to supply clear liquid to the external seal of the double system. Circulation is forced and maintained by an internal pumping ring. Barrier liquid pressure (ensured by the piston accumulator connected with the gland box) is higher than the sealed process pressure. Air- or water-cooled heat exchanger carries the heat away from the circulation system. Characteristics of the barrier liquid should be defined, to keep the operating conditions of the slide ring faces of the seal stable. Solution typical for double seals.

120 specjalistów

Contact us

ANGA Uszczelnienia Mechaniczne Sp. z o. o.
(ANGA Mechanical Seals LLC)

ul. Wyzwolenia 550
43-340 Kozy
Poland

Our experts will answer questions

You are welcome from Monday to Friday
from 7:00 a.m. to 3:00 p.m.

Search the website